How to Install Yanhua ACDP MQB 5D Interface Board?
1.Find the interface board installation area on the instrument according to the visual
positioning mark on the interface board.
2. Remove the corresponding two screws
3. Locate the D1-D4 positioning holes correctly on the instrument panel
4. Align the interface board with the screw fastener holes and D1, D2 positioning points
5. Press down on the interface board
6. Tighten the screws
7. Confirm again that the interface board D1, D2 positioning pins are completely aligned with the D1, D2 positioning holes of the instrument.
Finish installing the 5D interface board.